APPLICATION FOR ZONING PERMIT

Lot Size:
Building Size:

Warning: The approval of plans procured by Rear Lot Line misrepresentation of facts or conditions, misstatements in application or improper action by the Zoning Inspector does not legalize any illegal construction or arrangements.

In Consideration of the granting of this permit,I or Wee, agree to save the Village of New London Harmless from any and all damages whatsoever; and I , or We, do hereby covenant and agree to construct Said work in full compliance with laws of the State Of Ohio and the Ordinances of the Village of New London, and that all Statements made herein are correct and true.

VILLAGE OF NEW LONDON ZONING PERMIT

11. Building Heights:
12. Yard Dimensions:
13. Accessory Building Dimensions:

18. On a separate sheet attach a list of other supplemental requirements or conditions that will be met, or explain any points you feel need clarification.

NOTE: This permit shall be void if work is not started within 180 days.

Foot sidewalks are to be put in within 60 days of occupancy. Please attach a drawing of the proposed construction as to placement on lot.